Vitus Case Study : Nordhavn Container Terminal
Case Study · Nordhavn New Container Terminal

Less than 0.1% material waste on a new container terminal

How the Nordhavn New Container Terminal project uses Vitus to bring non-BIM specialists onto the digital twin, turning VDC prefabrication into a benchmark for lean, sustainable construction.

Owner
By & Havn
Contractor
Munck – Havne og Anlæg
Design
Cowi
<0.1%Material waste achieved through VDC-driven prefabrication
1Digital twin accessible to every team member, specialist or not
Real-timeVisualization and monitoring of construction as it happens
The challenge

Making VDC precision work for non-specialists too

The Nordhavn New Container Terminal is a state-of-the-art facility built for By & Havn, a key component in the expansion of Nordhavn, a dynamic and evolving district in Copenhagen. Contractor Munck Havne og Anlæg employs Virtual Design and Construction (VDC) for the prefabrication of reinforcement cages, an approach that only pays off if everyone on site can act on it.

VDC at scale

Prefabricating reinforcement cages digitally, safely and efficiently, with no room for waste.

Non-specialists on the digital twin

Success requires construction professionals who aren't BIM or VDC specialists to interact with the model too.

Lean has to be provable

Achieving under 0.1% material waste means every decision has to trace back to accurate project data.

With Vitus, everyone on site has easy access to the 3D models and the information we need.

Jan Peter Johannsen · Project Manager, Munck Havne og Anlæg
The solution

How the project turns data access into lean practice

Vitus empowers non-BIM specialists to interact with the project's digital twin in an intuitive and effective manner, enabling real-time visualization and monitoring of the construction process across all levels.

1

Vitus as the access layer

Every team member, specialist or not, gets easy access to models and data through Vitus.

The digital twin isn't just for BIM specialists anymore.
2

Real-time visualization on site

Construction progress is visualized and monitored as it happens, directly from the model.

Coordination happens as work unfolds, not after the fact.
3

Lean practice becomes the standard

Informed, accurate decisions at every level reduce material waste to a fraction of a percent.

Less than 0.1% waste, project-wide.
Vitus platform view of the Nordhavn Container Terminal model
Munck team lifting a prefab reinforcement cage on site
Key learnings

What Nordhavn New Container Terminal shows about lean, data-driven construction

Waste reduction starts with data access

VDC only pays off if the people executing it can see and act on the model too, not just plan from it.

Real-time visibility changes coordination

Monitoring construction as it happens replaces catching problems after the fact.

A benchmark for lean, sustainable infrastructure

The project's approach sets a standard other large-scale terminals and infrastructure builds can measure themselves against.

Ready to bring lean, provable precision to your site, like Nordhavn New Container Terminal?

Vitus makes your BIM data accessible, current and easy to act on, for everyone on the team, BIM specialist or not.